FAQs
Frequently asked questions Questions from procurement teams
How quickly will I receive a quotation after submitting an RFQ?
We respond with a full, itemised quotation within 24 hours of receiving a complete RFQ. If your requirement needs additional technical review — unusual materials, very tight tolerances, or a new product category — we will acknowledge within 24 hours and confirm a timeline. We do not believe in making customers wait three days for a number.
What information do I need to include in my RFQ?
The more detail the faster we can quote. Ideally: component description and application, material preference (or let us recommend), estimated annual or monthly quantity, dimensional drawing/CAD file/physical sample, target delivery timeline, and mould status. If you don’t have a drawing yet, send us a sample or sketch — our NPD team develops CAD from it.
What is your minimum order quantity (MOQ)?
Do you sign NDAs before reviewing technical drawings?
Which certifications does HnM Plastech hold?
What quality documentation do you provide with each shipment?
Every production batch ships with a Certificate of Conformance and dimensional inspection report. For first-article or new part launches, we provide a complete FAI/PPAP package including dimensional report, material test certificate, process capability data, and appearance approval where relevant. For medical components we maintain full lot traceability from raw material to finished goods.
Is your facility a clean room?
Can you handle CAPA, 8D reports, and customer quality audits?
How long does mould/tooling development take?
What is your injection moulding machine range and capacity?
We operate 10 Ferromatik Milacron injection moulding machines ranging from 80 tonnes to 250 tonnes, with a 300-tonne machine planned for 2026. We also have a dedicated blow moulding line for TPE/TPV hollow components. Mould capability spans 2 to 128 cavities with tolerances of ±0.1mm to ±0.5mm.
What materials do you process?
Can you over-mould plastic on metal components?
Do you export? Which countries do you supply?
What are your standard lead times for mass production orders?
For repeat production orders on existing moulds, standard lead time is 4–6 weeks from purchase order to dispatch, depending on volume and material procurement. For urgent requirements, speak to our team and we will give an honest answer based on current machine loading.
What shipping and Incoterms do you work with?
What are your payment terms?
How is tooling cost handled — do I own the mould?
Yes — the customer owns the mould. Tooling is invoiced separately from component pricing. Once paid, the mould is your asset, stored at our facility for production. If you decide to move production elsewhere, the mould is released to you with 30 days notice. We maintain and repair moulds at no additional charge during normal production life.