Quality Testing Lab
21 in-house instruments — no third-party lab waits.
VMM resolution 0.0005mm
Force tester Mark-10 USA
MFI testing In-house
Total instruments 21 items
NPD & Prototyping
From concept sketch to validated first-article sample with full test pack.
Sample lead time 60 days
DFM review Included
CAD from sample Yes
Test reports Full package
Sustainable Infrastructure
Solar power, 400KVA backup, 25,500 CMH AHU ventilation.
Solar capacity 65 kW
Generator 400 KVA Sudhir
AHU 25500 CMH DUSTECH
EOT cranes 2 × 2T GRIPS
Injection Moulding
10 Ferromatik Milacron machines in AHU clean room across all sectors.
Machine range 80T – 250T
No. of machines 10 units
Environment AHU clean room
Expansion (2026 300T planned
Blow Moulding
10 Ferromatik Milacron machines in AHU clean room across all sectors.
Machine range Jagmohan BMM-01
No. of machines Up to 1000ml
Environment TPE / TPV
Expansion (2026 March 2025
In-house Tooling
VMC, lathe, milling, and surface grinding. 60-day mould delivery at ±0.1mm.
Delivery time 60 days
Cavity range 2 – 128 cavities
Tolerance ±0.1 – 0.5mm
Gate fill 0.3mm
